COMPANY OVERVIEW
Project Overview
The project involves the completion of Daman's 'Buildings by Daman' project at the Dubai International Financial Centre (DIFC). It comprises an L-shaped block composed of two buildings of different heights intersecting and overlapping each other.
The first tower is a 20-storey structure that mostly houses office space with hotel amenities on the top three levels.
The second tower, partially overlapping the office tower, is a 60-storey tower which is composed of two structures that are interconnected with a structural steel link bridge that has impressive sky gardens on both sides. These structures comprise serviced and residential apartments, and an 18-storey hotel.
The two buildings sit over a nine-level podium area with automated and traditional car parks, retail space, and community areas including as swimming pools, cafes and green areas.
The scope of work includes the residual works to complete all the building structures, external works, site facilities and landscaping. It also includes the fit-out works for the residential apartments and common areas, complete facade works and primary services to all the buildings.
The project was approximately 35% completed and BIC Contracting LLC (previously known as HLG Contracting LLC) is responsible for its completion.